Post-construction cleaning is one of the best-paid jobs in the cleaning business, and one of the easiest to get wrong. Construction dust gets everywhere, the work often happens in several visits, and the condition of the site can be very different from what the contractor described on the phone.
This guide explains the phases of a post-construction clean, what businesses charge in the U.S., and a simple method to price these jobs, with a worked example.
The three phases of post-construction cleaning
Post-construction cleaning usually isn’t one job. It’s often split into phases, and each one should be priced separately:
- Rough clean: done while construction is still finishing. It removes debris and most of the construction dust from floors, walls and surfaces. It’s not the final clean.
- Final clean: done once the work is finished. It removes the last dust, fingerprints and stickers, wipes every surface, cleans vents, vacuums floors and, if agreed, cleans windows. This is the clean that makes the space ready to live in.
- Touch-up clean: a short return visit to remove dust that settled after the final clean, usually on countertops, window sills, vents and some floors.
Some jobs also include exterior cleaning, such as outside windows, debris removal or pressure washing. Always ask which phases the client needs before quoting.
How much to charge for post-construction cleaning
Here are typical U.S. rates per square foot by phase, according to Fixr (2025 data):
| Phase | Typical rate per sq ft |
|---|---|
| Rough clean | $0.15–$0.40 |
| Final clean | $0.20–$0.60 |
| Touch-up clean | $0.25–$0.60 |
| Exterior clean | $0.29–$0.60 |
Fixr also reports hourly rates of around $30 to $50 per worker, and notes that many projects have a minimum of 8 hours with 2 workers. Real invoice data from Tofu shows a median of $507 for post-construction cleans, with most jobs between $323 and $1,034.
The range is wide because no two sites are the same. A small renovated bathroom and a brand-new 3,000 sq ft house are completely different jobs.
New construction vs. post-renovation cleaning prices
Not every construction clean up is the same job, and the price should reflect that.
New construction cleaning is usually the bigger job. Every surface in the building is covered in fine dust, there are stickers on windows and appliances, paint and caulk marks on floors, and often a lot of debris left behind. New builds also tend to be larger and need every window, cabinet and fixture cleaned for the first time. According to Fixr, the high end of the market, around $2,400, is a new construction clean that includes complete cleaning, junk removal, exterior work and spot cleaning.
Post-renovation cleaning usually covers a smaller area, like a remodeled kitchen or bathroom, but it comes with its own challenges. People often live in the home, so you have to work around furniture and belongings, and dust from the renovated room usually spreads to the rest of the house. Fixr puts the low end of the market, around $275, at a rough clean of a renovated apartment.
When you quote, ask which one it is, and always ask how far the dust has spread beyond the work area. A small bathroom remodel can still mean dusting the whole house.
How to price a post-construction job, step by step
1. Visit the site before quoting. This is not optional for post-construction work. Photos rarely show how much dust is really there, and you need to see the debris, the finishes and the number of windows.
2. Agree on the scope with the contractor or owner. Which phases? Is debris removal included, or will the contractor clear it? Are windows included, inside and out? Who removes stickers and paint splatters?
3. Estimate the hours. Construction dust takes longer than normal dirt. A useful starting point is that one cleaner covers around 250 square feet per hour on a final clean, compared with about 500 on a standard house clean. Add time for bathrooms, windows and heavy dust.
4. Price each phase separately. Multiply hours by your hourly rate for each phase, then add extras like interior windows. Pricing by phase protects you: if the client skips the rough clean, your final clean will take longer, and the quote should reflect it.
5. Check your price against the market. Divide your total by the square footage. If you’re outside the typical range, review your time estimate.
6. Plan your equipment. Construction dust needs the right tools: a vacuum with a HEPA filter, microfiber cloths, scrapers for stickers and paint, and protective masks. Factor the wear on your equipment into your rate.
7. Write clear terms. State that the site must be free of workers and large debris when you arrive, and that extra visits caused by new construction work will be charged separately.
A worked example
A contractor has just finished remodeling a 2,000 sq ft house with 2 bathrooms. They’ve cleared the large debris and need a final clean, plus a touch-up visit before the owners move in. The house has 15 interior windows.
| Item | Price |
|---|---|
| Final clean (8.6 cleaner-hours at $50/hour) | $430 |
| Interior windows (15 windows at $6 each) | $90 |
| Touch-up visit (2 cleaner-hours at $50/hour) | $100 |
| Total | $620 |
That works out to about $0.31 per square foot, within the typical range for a final clean. With a team of two, the final clean takes a little over 4 hours on site. You can reproduce the final clean estimate with our free cleaning estimate calculator by selecting “Post-construction clean”.
Where to find post-construction jobs
The best source is contractors and remodelers, because they finish projects every month and need a cleaner they can trust. Real estate agents selling new builds and property managers renovating units are also good partners. Our guide on how to get your first cleaning clients explains how to approach local partners.
Common mistakes to avoid
- Quoting without visiting the site. Construction dust is impossible to judge from photos.
- Pricing it like a deep clean. Fine dust settles again and again, and takes much longer to remove.
- Not defining the phases. If you quote a “final clean” and arrive to a rough-clean situation, you’ll lose money.
- Starting while workers are still on site. New dust will undo your work.
- Forgetting the touch-up visit. Dust keeps settling for days; plan and price a return visit.
Frequently asked questions
How much does construction clean up cost?
Fixr reports a national average of about $650 for post-construction cleaning, with most jobs between $500 and $800. Real invoice data from Tofu shows a median of $507. Large new builds with junk removal and exterior work can cost much more.
What’s the difference between new construction and post-renovation cleaning?
New construction cleaning covers an entire new building, with dust, stickers and debris everywhere. Post-renovation cleaning usually covers part of a home that people still live in, so it’s smaller but requires more care around furniture and belongings.
How much does post-construction cleaning cost per square foot?
Typically between $0.15 and $0.60 per square foot, depending on the phase and the condition of the site. Final cleans usually fall between $0.20 and $0.60.
How long does a post-construction clean take?
It depends on size and dust levels. As a rough guide, one cleaner covers around 250 square feet per hour on a final clean, so a 2,000 sq ft home takes about 8 to 9 cleaner-hours.
Should I charge by the hour or by the square foot?
Estimate the hours to calculate your price, then present it as a fixed price per phase. Clients get a clear number, and you’re protected because it’s based on real time.
Do I need special equipment for post-construction cleaning?
A HEPA-filter vacuum is the most important tool, because regular vacuums spread fine construction dust back into the air. Add scrapers, plenty of microfiber cloths and protective masks.
