A new construction clean is one of the most detailed jobs in the cleaning business. Fine dust covers every surface, stickers and protective film are everywhere, and the client expects the building to look move-in ready. Without a clear checklist, it’s easy to miss something, and the client will notice.
This guide gives you a complete new construction cleaning checklist, phase by phase and room by room, plus a free printable version you can download and take to every job.
Before you start
A post-construction clean goes much more smoothly when the site is ready. Before you begin, confirm these points with the contractor or owner:
- Construction work is finished. If other trades are still working, new dust will undo your work.
- Large debris has been removed. Agree on who removes leftover materials, boxes and packaging.
- Water and electricity are on. You’ll need both.
- The scope is agreed in writing. Which phases, whether windows are included inside and out, who removes stickers, and whether exterior work is included.
- Before photos are taken. Photograph every room before you start. They protect you if there’s a disagreement later.
If you haven’t priced the job yet, our guide on how to price post-construction cleaning explains each phase and what to charge.
Phase 1: Rough clean
The rough clean happens during or right after construction. The goal is to remove the bulk of the dust and debris, not to make the space perfect.
- Remove small debris and packaging (nails, screws, wood and drywall pieces).
- Vacuum dust from floors with a HEPA-filter vacuum.
- Do a first wipe of walls and surfaces to remove the heaviest layer of dust.
- Clear debris from window sills and tracks.
- Empty and bag all trash.
Phase 2: Final clean
The final clean happens once all construction work is complete. This is the clean that makes the building ready to live or work in. Work top to bottom, so dust falls onto areas you haven’t cleaned yet.
Throughout the building:
- Dust ceilings, corners and crown molding.
- Clean light fixtures and ceiling fans.
- Clean vents, returns and grilles.
- Wipe walls, doors and door frames, and spot-clean marks.
- Wipe light switches, outlets and door handles.
- Clean baseboards.
- Remove stickers, labels and tape from windows, fixtures and appliances.
- Remove paint and caulk spots from hard surfaces (test on a hidden area first).
Kitchen:
- Clean the inside and outside of all cabinets and drawers.
- Wipe countertops and backsplash.
- Clean the sink and faucet.
- Clean appliances inside and out, and remove protective film.
Bathrooms:
- Clean toilets, tubs and showers, including grout haze and caulk residue.
- Clean sinks, faucets and vanities.
- Clean mirrors and glass shower doors.
- Wipe cabinets inside and out.
Windows, floors and finish:
- Clean interior windows, frames and sills (and exterior windows, if included).
- Vacuum and mop all hard floors. Mop again if dust remains.
- Vacuum carpets.
- Do a final walkthrough with the client and take after photos.
Phase 3: Touch-up clean
Construction dust keeps settling for days after the final clean. A short touch-up visit, usually a few days later and just before move-in, makes sure the client walks into a spotless space.
- Dust surfaces where dust has settled again: counters, sills, shelves and fixtures.
- Wipe vents and returns again.
- Do a quick vacuum and mop of the floors.
Download the free checklist
Want to take this checklist to your next job? Download the free one-page version. Print it, tick each task as you go, and leave a copy with the client to show exactly what was done.
Tips for a better post-construction clean
- Use the right tools. A HEPA-filter vacuum stops fine dust from going back into the air. Add plenty of microfiber cloths, scrapers for stickers and paint, and masks.
- Change cloths often. Construction dust is abrasive. Dirty cloths spread it around and can scratch new surfaces.
- Be careful with new finishes. New paint, wood floors and countertops can be delicate. Avoid harsh chemicals and abrasive pads unless you know the surface.
- Ventilate. Open windows when possible to clear dust and chemical smells.
- Plan for the touch-up. Include it in your quote from the start, so the client knows it’s part of the service.
Frequently asked questions
What does a new construction clean include?
It usually includes three phases: a rough clean to remove debris and heavy dust, a final clean of every surface, fixture, cabinet, window and floor, and a touch-up clean to remove dust that settles afterward.
How long does a new construction clean take?
It depends on the size of the building and the amount of dust. As a rough guide, one cleaner covers around 250 square feet per hour on a final clean, so a 2,000 sq ft home takes about 8 to 9 cleaner-hours.
Do I need to clean inside cabinets after construction?
Yes. Construction dust gets inside cabinets and drawers, and the client will expect them to be clean before they put anything inside.
Should I remove stickers and paint spots?
Usually yes, but agree on it in advance. Removing stickers and paint spots takes time, so it should be included in your scope and your price.
